The most common mistake homeowners make is nailing the vinyl siding too tight.
How do you use a finishing strip in vinyl siding.
Snap a level chalk line for the first starter strip at the base of the wall no less than 8 inches above ground level after determining the lowest corner of the house.
The bottom piece here is a starter strip which is specific to this particular type of siding product.
For most of the house this method works wonderfully except for the top row.
Without an additional layer of siding to cover it as it touches the soffit installers must take extra steps to give the.
This is where the new siding will begin.
The advantage to using vinyl siding on the exterior of your home is you will not need to paint it as frequently and it is easy to repair using only a few tools.
Like most vinyl siding vinyl shake installation starts with the application of the appropriate trim strips around the perimeter of the area to be covered.
Wear safety goggles for all cutting and nailing operations and follow safe construction practices.
This chalk line should be level and a consistent distance from the eaves or the top and bottom of the windows.
It s installed along a level line with long roofing tacks.
Depending on the tools you use for a safe clean and straight cut.
Remove any siding or exterior finish that isn t compatible with vinyl siding and make sure the walls are sheathed with a substrate to receive the siding.
Vinyl siding starter strips.
1 2 inch 1 3 cm plywood or osb are common substrates and these are generally covered with roofing felt or another moisture barrier prior to siding the walls.